以多条铁路弃渣场变更为例,从变更原因、变更核对和数据统计、弃渣减量化和资源化、监督检查意见、选址、措施设计6个方面对变更弃渣场方案编制的重难点进行分析。建设单位、设计单位、施工单位应高度重视,严格控制弃渣场变更、严禁随意弃渣,加强骨料自身利用和地方的综合利用,确需变更的应在弃渣前及时履行变更水土保持方案手续。
Abstract:Taking the change of multiple railway waste disposal sites as an example, this article analyzes the key and difficult points in the preparation of the change waste disposal site plan from six aspects: reasons for the change, change verification and data statistics, waste reduction and resource utilization, supervision and inspection opinions, site selection, and measure design. The construction unit, design unit, and construction unit should attach great importance to it, strictly control the change of the waste disposal site, prohibit arbitrary waste disposal, strengthen the self-utilization of aggregates and the comprehensive utilization of the local area. If it is necessary to make changes, the procedures for changing the water and soil conservation plan should be carried out in a timely manner before the waste disposal.
[1]姜德文.弃渣场的水土保持审查与管理[J].中国水土保持,2018(4):4-7.
[2]杨艳,唐云逸,谭枭,等.浅析弃渣场变更水土保持方案补充报告编制与审查关键问题:以四川省某高速公路项目为例[J].四川水利,2024,45(3):194-196,200.
[3]高二鹏,邢军朝,章健华,等.新时期铁路弃渣场变更原因分析及弃渣资源化管控措施思考[J].中国水土保持,2024(11):57-59.
[4]张帅,韩立鹤.铁路建设项目弃渣场变更原因分析及防治对策研究[J].铁道标准设计,2023,67(4):175-179.
[5]李国辉,刘元宏,徐赟,等.高速公路建设弃渣场变更因素及对策研究[J].水土保持应用技术,2024(5):57-59.
[6]周杨.铁路建设项目弃渣场过程管理方法探讨[J].铁路节能环保与安全卫生,2020,10(4):28-31.
基本信息:
DOI:10.16374/j.cnki.issn2095-1671.2026.0005
中图分类号:X731;S157
引用信息:
[1]张帅,周立波,韩立鹤.弃渣场变更水土保持方案编制重难点分析及对策[J].铁路节能环保与安全卫生,2026,16(01):28-31.DOI:10.16374/j.cnki.issn2095-1671.2026.0005.
2025-04-30
2025
2025-06-12
2026-01-27
2026
1
2026-02-28
2026-02-28